Achievements
Market square Zele
The Market square of Zele has recently been completely transformed from a busy traffic artery into a car-reduced, climate-resilient, and green meeting square.
R4 - Ring road Ghent
The large-scale construction works around the R4 in Ghent form part of the R4WO (R4 West and East) project.
This is one of the largest infrastructure projects in Flanders, aimed at making the northern R4 safer and smoother for both cars and cyclists.
The project is transforming the R4 from a road with many traffic lights into a primary road with grade-separated junctions.
Toots - new metro station Brussels
Building tomorrow’s mobility.
Work on Toots Thielemans station is laying the foundations for a faster and smoother connection through the heart of Brussels.
This complex construction site between South Station and Anneessens is a technical feat: a completely new station and tunnel junction is being built whilst the city continues to function above it.
A crucial link for the future Metro Line 3.
Oosterweel Link Antwerp
The Oosterweel Link is a massive infrastructure project that completes the Antwerp Ring Road (R1).
The aim is to reduce traffic congestion in and around Antwerp by diverting through traffic and port traffic away from the current Ring Road.
Zeebrugge played a crucial role in the Antwerp Oosterweel Link.
Eight enormous tunnel segments for the new Schelde Tunnel were constructed in a specially designed construction dock in the inner harbour.
For this project, we were commissioned to supply 16 400A cabinets.
Vlissingen - Energy hub
Vlissingen, as part of North Sea Port, is currently one of the key hubs for the European energy transition. The structures you see there form a physical ‘hub’ where wind energy from the North Sea comes ashore, is stored and converted.
Terneuzen Lock
The works in Terneuzen centre on the construction of the New Lock, one of the largest locks in the world.
The lock has been built to make the port of Ghent (part of North Sea Port) accessible to the very largest seagoing vessels (Post-Panamax).
For this project, we supplied 400A, 630A and 1000A site distribution boards.